Case of antici-
pated restart
with
programmed
delay only
Programming S900II Level 1
Version 2.2 |>
V Specific programming
64
01T01527_2
25.5.00
V 5. IMM anticipated restart (option)
Aim :
Shorten the cycle time by masking the IMM reaction time (time between the closing authorization
from the robot and the actual mould movement).
Principle
:
The machine cycle validation (VCM) and the arm free safety (SBD) are given when the robot is still
inside the mould.
Safety
:
If one of the data items mould open (MO) or partial opening reached (OPA) disappears whilst the robot
is still inside the mould, the robot goes into fault and immediately interrupts the mould closing
authorization commands.
D_5 : MOVEMENT OUTSIDE CAMS : if there is no anticipated restart running.
D_32: PREMATURE MACHINE RESTART : if an anticipated restart is running.
D_35: ANTICIPATED RESTART NOT CONFORM : if the monitoring circuit has been set off.
Type of anticipated restart
:
There are two types of anticipated restart :
anticipated restart with a programmed delay,
autoadaptative anticipated restart.
Parameter 174 (RLCE_ATCP_1) defines the type of anticipated restart. See S900II Configuration
manual.
Conditions
:
The IMM anticipated restart is only effective if :
the robot is in automatic mode,
and if the overall speed coefficient Kv = 100 %
and if the offset wait is not valid (parameter 451)
and if the instruction SET WWRD 63 = xxxx is in step 00 of the PRG
and if the value of WWRD 63
Parameter 175
2
V 1.0 PC Editor
V 2.0 robot